Laserfiche WebLink
Colorado Department of Public He; DRAFT <br />Air Poll <br />Denison Mines (USA) Corp. PERMIT <br />• Permit No. 09MO0325F <br />Initial Approval <br />c. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing APEN expires. APENs expire five (5) years from the <br />date/s of submittal. <br />Charles N. Pray, P.E.-P.L.S. <br />Permit Reviewer <br />• <br />0 <br />Permit History: <br />Initial Approval: This Issuance. <br />R K Hancock III, P.E. <br />Construction Permits Unit Supervisor <br />APFN Suhmittal Loa (to be maintained further by the nermittee): <br />APEN Submittal Date APEN Expiry Date Renewal APEN to be <br />submitted b Remarks <br />April 7, 2009 Aril 7, 2014 March 8, 2014 AIRS Point 001 <br /> Mining <br /> <br /> <br />APEN Submittal Date APEN Expiration Date Renewal APEN to be <br />submitted b Remarks <br />April 7, 2009 April 7, 2014 March 8, 2014 AIRS Point 002 <br /> Ventilation <br /> <br /> <br />AIRS ID: 085/0970/001, 002 <br />Page 3 of 7