Laserfiche WebLink
Colorado Department of Public Health and Environment j f ' <br />Air Pollution Control Division r? Page 6 of 6 <br />- MINING OPERATIONS - <br />• <br />• <br />0 <br />K. FINISHED PRODUCT STOCKPILE(S) -Not applicable <br />Maximum Stored At One Time: Tons <br />Proposed Controls For Finished Product Stockpile:p <br />? Watering - - <br />Times/Day, 74 <br />? Chemical Stabilizer <br />? Compacting Of Piles <br />? Enclosures Type: (Complete or Partial) <br />? Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />? Other (specify) <br />L. RAW MATERIAL TRANSPORT FROM REMOVAL SITE TO STOCKPILES <br />Haul road distance (one way) Approxxiimately Feet <br />Road surface silt content (if known) % <br />Not applicable <br />(speedsin <br />Posted speed limit on haul road portal area m.p.h. <br />limited by <br />configuration) <br />10 <br />11 <br />Other: <br />Vehicle Tyne <br />1 18-Wheelers <br />2 10-Wheelers <br />3 4-Wheelers <br />4 Front-end loader <br />Watering <br />? Frequent (Watering Frequency of 2 or More Times Per Day) <br />® As Needed <br />Chemical Stabilizer <br />Gravelling <br />Ca aci Empty Weight <br />Tons Tons <br />Tons Tons <br />Tons Tons <br />5 Tons 20 Tons <br />M. FINISHED PRODUCT TRANSPORT (ON SITE) <br />No. Of Trips Per/Day <br />Maximum 50 <br />Amount of material for off-site transfer: 20,000 Tons ore per year <br />On-site haul road distance (one way) 300 Feet <br />Road surface silt content (if known) % <br />Posted speed limit on-site: n/a m.p.h. <br />® Watering <br />? Frequent (Watering Frequency of 2 or More Times Per Day) <br />® As Needed <br />? Chemical Stabilizer <br />? Gravelling <br />? Paving <br />Other: <br />Vehicle Tyne <br />1 18-Wheelers <br />2 10-Wheelers <br />Revised September 2004 <br />Capacity <br />Tons <br />Tons <br />Emlty Weight No. Of Trips Per/Day <br />Tons <br />Tons <br />httl2:Hww-w.cdl2he.state.co.us/ap/stationaiy.html