Laserfiche WebLink
Section 5 <br />conc/asions <br />Leaching Potential: The pot( <br />leachate was evaluated usin4 <br />percolation that would be ex <br />that the rock could release d: <br />However, detailed analyses i <br />unsaturated flow modeling i <br />leachate is unlikely. These ar <br />would be expected to be rem <br />at the Van 4 Mine. <br />ntial for the development rock to generate toxic <br />MWMP testing and evaluation of the volume of <br />)ected from the piles. The MWMP testing indicates <br />;solved constituents into pore water within the pile. <br />f percolation using water balance estimates and <br />(dicates that generation of significant quantities of <br />ilyses show that water infiltrating into the piles <br />)ved. by evaporation in the and environment present <br />• <br /> <br />4-2