My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-08_REVISION - M1997032 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997032
>
2009-06-08_REVISION - M1997032 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:26 PM
Creation date
6/10/2009 8:18:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
REVISION
Doc Date
6/8/2009
Doc Name
EPP (AM-01) Attachment 1,2,&3 of Attachment A (part 2)
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secfion 4 <br />Pofenfia/forRock fo be Toxic Forming <br />• Exhibit 4-1 presents the results of monthly percolation estimates for an average <br />precipitation year. <br />Exhibit 4-1. Estimated percolation through develo ment rock areas for average precipitation <br />Month Potential <br />ET in. Precipitation <br />in. Actual <br />ET in. Runoff <br />in. Infiltration <br />in. Percolation <br />in. <br />October 3.36 1.51 1.36 0.15 1.36 0.00 <br />November 2.19 1.05 0.95 0.11 0.95 0.00 <br />December 0.48 0.85 0.48 0.09 0.77 0.00 <br />Janus 0.47 0.88 0.47 0.09 0.79 0.00 <br />February 1.94 0.76 1.30 0.08 0.69 0.00 <br />March 2.93 1.04 0.94 0.10 0.94 0.00 <br />April 3.70 1.01 0.91 0.10 0.91 0.00 <br />May 4.93 0.94 0.84 0.09 0.84 0.00 <br />June 5.72 0.47 0.43 0.05 0.43 0.00 <br />Jul 6.34 1.18 1.06 0.12 1.06 0.00 <br />August 5.74 1.35 1.22 0.14 1.22 0.00 <br />September 4.43 1.50 1.35 0.15 1.35 0.00 <br />Annual Total 42.33 12.55 11.29 1.25 11.29 0.00 <br />The estimate summarized in Exhibit 4-1 indicates that potential ET exceeds average <br />precipitation by a ratio of approximately 3.4 to 1. Under average conditions, available <br />ET is adequate to evaporate water infiltrating the surface of the rock piles. A <br />temporary increase in stored soil moisture would occur during the months of January <br />and February, but this water would be removed from the pile by ET in later months. <br />Monthly estimated ET exceed monthly precipitation during all months of the year. <br />Exhibit 4-2 presents a similar estimate using precipitation conditions that occurred <br />during the wettest year on record, 1997. <br />Exhibit 4-2. Estimated ercolation throw h develo ment rock areas for wettest year on record <br />Month Potential <br />ET in. Precipitation <br />in. Actual <br />ET in. Runoff <br />in. Infiltration <br />in. Percolation <br />in. <br />October 3.36 2.36 2.12 0.24 2.12 0.00 <br />November 2.19 2.16 1.94 0.22 1.94 0.00 <br />December 0.48 1.80 0.48 0.18 1.62 0.00 <br />January 0.47 1.09 0.47 0.11 0.98 0.00 <br />February 1.94 0.48 1.94 0.05 0.43 0.00 <br />March 2.93 0.17 0.30 0.02 0.15 0.00 <br />A dl 3.70 2.41 2.17 0.24 2.17 0.00 <br />May 4.93 1.78 1.60 0.18 1.60 0.00 <br />June 5.72 0.62 0.56 0.06 0.56 0.00 <br />Jul 6.34 1.20 1.08 0.12 1.08 0.00 <br />August 5.74 1.10 0.99 0.11 0.99 0.00 <br />September 4.43 4.70 4.23 0.47 4.23 0.00 <br />Annual Total 42.23 19.87 17.88 1.99 17.88 0.00 <br />The estimate summarized in Exhibit 4-2 for the wettest year on record indicates that <br />potential ET exceeds precipitation by a ratio of approximately 2.1, and suggests that <br />water infiltrating the pile also evaporates during the year. During the months of <br />December and January, the monthly precipitation exceeds the estimated monthly ET. <br />Therefore, stored moisture within the rock pile would be expected to increase during <br />December and January. However, excess ET occurring in latter months is estimated to <br />4-11
The URL can be used to link to this page
Your browser does not support the video tag.