Laserfiche WebLink
14.0 Construction Schedule <br />The Van 4 Mine is an existing facility with new improvements consisting mainly of <br />modifications of existing stormwater control facilitates. Since there are no designated <br />chemicals, acid- or toxic-forming material, or acid mine drainage at the Van 4 Mine, <br />then no EPFs will be constructed in the future. <br />U <br />0 <br />14-1 <br />TA64986-Denison MinesUask Order 4 - EPP Sunday Mines Group.Van41Van4\FINAL ReporhFINAL - Environmental Protection Plan Van4.doc