Laserfiche WebLink
4.0 Designated Chemical(s) Evaluation <br />• As previously stated, designated chemicals are not present at the Van 4 Mine. <br />Extractive metallurgical processing is not conducted at the Van 4 Mine. The ore <br />produced at the mines is shipped to the Denison mill near Blanding, Utah for <br />processing. A copy of the transportation policy for shipments of Colorado Plateau <br />Uranium Ores to the White Mesa Uranium Mill is included in Attachment G. <br />0 <br />0 <br />4-1 <br />T,04988-Denison MinesUask Order 4 - EPP Sunday Mines Group-Van4\Van4tFINAL RePorITINAL - Environmental Protection Plan Van4.doc