Laserfiche WebLink
i <br />amen <br />Earth $ Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: May 30, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 05/26/09 through 05/30/09 <br />Days S M T W T F S <br />Work Shifts - D D D <br />D D D <br /> - - - N E N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 40°F to 50°F (+/-) High: 52° F to 59°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Work not performed on Monday in observance of the Memorial Day Holiday. Weather delays <br />due to rain on Tuesday and over the weekend delayed fill placement within the Phase 5 VLF due <br />to saturated haul routes. Only tracked equipment continued to work through the rain showers on <br />Tuesday. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />B) Stripping/Slope Recontouring <br />1) VLF <br />Stripping and slope recontouring for the East Perimeter Road continued during the week <br />between stations A5+00 (+/-) and A24+00 (+/-) approximately 0 to 150 feet right of centerline, <br />using a CAT D-10 dozer and one CAT 345 excavator. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />Sheet 1 of 6 <br />VLF Weekly Report WE 05.30.09.D.doc