Laserfiche WebLink
1 <br />Table 3 <br /> <br />Calculation of Phased Augmentation Requirements <br />Flag Resources Inc. <br />(acre feet) <br /> Consum tlve Water Use Augmentation P-e uirements <br /> (1) (2) (3) (4) <br /> Batch Plant, Gravel Evaporation per Batch Plant, Gravel Evaporation per <br /> Mining, & Misc. Surface Acre (acre mining, & Misc. Surface Acre (acre <br /> Water Uses feet Water Uses feet <br />January 018 0.00 0.00 0.00 <br />February 0.18 0.00 0.00 0.00 <br />March 0.27 0.11 0.00 0.00 <br />April 0.66 0.27 .0.34 0.14 <br />Msy 1.03 0.39 0.00 0.00 <br />June 1.38 0.50 0.73 0.26 <br />July 1.67 0.50 1.76 0.53 <br />August 1.15 0.44 1.20 0.46 <br />September 1.17 0.31 1.23 0.32 <br />October 0.69 0.19 0,73 0.20 <br />November 0.30 0.10 0.00 0.00 <br />December 0.18 0.03 0.00 0.00 <br />Annual 8.88 2.82 8.00 1.91 <br />i <br />i <br />(1) From Tabie 2, Sum of Columns (3), (4) & (5) <br />(2) Table 1, Column (7) <br />(3) & (4) Assumes a Water Right Call from April 15-30, and June 16-Oat 31 with a 5% Transit Loss <br />Exhibit D