My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-08_PERMIT FILE - X200722900
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200722900
>
2009-06-08_PERMIT FILE - X200722900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:25 PM
Creation date
6/8/2009 12:59:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200722900
IBM Index Class Name
PERMIT FILE
Doc Date
6/8/2009
Doc Name
180-Day Report
From
Twentymile Coal Company
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />JINN U 8 2009 <br />"' . Diviolun or Reclamation, <br />COLORADO DI'V'ISION OF RECLAMATION , MININWANW98W ET'Y' <br />- „ ; 1 313 Sherman Str t.. Room 215.1 Dcti ver.. C- 4modo <br />COAL EXPLORATION 180-DAY REPORT <br />Prospector: Twentymile Coal Company <br />Notice of Intent Nos.: X-2007-229-00 <br />Address: 701 Market Street, Suite 832 <br />St. Louis, MO 63101 <br />Project Name: Cow Camp Underground <br />County: Routt <br />Site Contact Address: <br />Scott Cowman <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />Date: June 4, 2009 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining, adopted in accordance with the Colorado Surface Coal Mining Act, <br />C.R.S. 34-33-101 et seq. The purpose of this report is to update the Division on exploration and reclamation <br />activities that have occurred in the past 180 days of active prospecting. The report also indicates any changes <br />in operations from what was stated in the original Notice of Intent sent to the Division. The Operator may <br />use this form, modify this form, or use a different format altogether. <br />Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill-rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 days. Mention sealing and <br />plugging, regrading, retopsoiling and reseeding activities. (Attach additional pages, if needed.) <br />Ten of the eleven exploration holes (10 pads at less than i/4 acre each) have been drilled, sealed and plugged. The locations have <br />been regarded, contoured, top soiled, and reseeded. We are currently checking each exploration hole site to make sure sites are <br />completely reclaimed. <br />3. List any additional changes to the original prospecting and reclamation plan or any unexpected problems <br />(such as unexpected water or artesian conditions encountered). (Attach additional pages, if needed.) <br />CCU-001 was converted into a seater well and was transferred to the land owner. <br />4. When do you expect to complete all exploration and reclamation activities for this project? <br />The exploration is complete and inspection of the pads is being done this summer for reclamation completion.
The URL can be used to link to this page
Your browser does not support the video tag.