Laserfiche WebLink
-4- <br />12. Primarv future (Post-mining) land use (check one): <br />IX I <br />1J Cropland(CR) Pastureland(PL) <br />FI <br />General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) S <br />lid W <br /> o <br />aste Disposal(WD) <br />13. Primary resent land use check one : <br />J? Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Minin : Briefly explain mining method (e.g. truck/shovel): Mining Will be with dozer, front-end <br />loader, and trucks. <br />15. On Site Processing: _0 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): N/A <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: N/A <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />We are proposing to double the size of the existing Waed Pit, opening a like-sized <br />new area to the east of our current pit. As we complete mining in the original <br />110 pit, we will begin reclamation there and move mining to the newly opened area.