Laserfiche WebLink
,. <br />FORBS: <br />sheet 2 of 2 <br />annuoa N,rvu i recta (seen) : <br />i v I AL xcus i 5[A. r 1.: 4u.1y • TOTAL POUNDS PLS /ACRE: 6.75 • TOTAL SEED MIX COST / ACRE : $17.84 <br />Seed application method : Drill seeding (DMG survey data) TOTAL SEED APPLICATION COST! ACRE : $76.78 <br /> <br />MULCHING and MISCELLANEOUS <br />Materials - item no. 1 <br />item no. 2 <br />item no. 3 <br />item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT COST /UNIT COST /ACRE <br />Straw, delivered {DMG survey data} 2.00 ton $102.28 $204.56 <br />Herbicide - Curtail @ 4.0 pt/ac 1.00 acre $31.31 $31.31 <br /> <br /> <br />Application - method no. 1 : Power mulcher (MEANS 32 91 13.16 <br />method no. 2 <br />method no. 3 <br />TOTAL MULCH MATERIALS COST / ACRE : <br />with tractor (DMG survey <br />Weed spray, truck, aquatic area, nox. <br />$235.87 <br />$65.78 <br />$57.07 <br />$52.13 <br />TOTAL MULCH APPLICATION COST / ACRE : $174.98 <br /> <br />NURSERY STOCK PLANTING TYPE and SIZE <br />COMMON NAME NO. / ACRE (planting cost data source) .... <br />MATERIAL <br />COST / PLANT .. .... <br />PLANTING <br />COST / PLANT .....:. <br />COST / FERT. <br />PELLET <br />TOTAL <br />COST / PLANT <br />TOTAL <br />COST / ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST / ACRE : $0.00 <br />JOB COST No. of acres : 11.55 Cost / acre: $682.01 INITIAL JOB COST : $7,877.19 <br />Estimated failure rate (percent) : 25.00% Cost / acre': $682.01 RESEEDING JOB COST : $1,969.30 <br />Selected replanting work items : F T S M TOTAL JOB COST : $9,846