My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-04_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2009-06-04_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:18 PM
Creation date
6/4/2009 3:36:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
6/4/2009
Doc Name
Response to Adequacy Review Comments Dated March 16, 2009
From
Blue Mountain Energy
To
DRMS
Type & Sequence
RN5
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision 60 <br />List of Changes <br />Text: <br />Page IV-16 (Section IV.D) <br />Modified reference to Map 76 deleting schedule reference from prior map version. <br />Page IV-17 (Section IV.D) <br />Removed reference to date "...that will be used until 2006..." to help keep text current. <br />Page IV-18 (Section IV.D) <br />Removed paragraph concerning 4(h): l(v) slope. This information was added back in on <br />Page IV-22. <br />Added reference to 2004 drilling and geotechnical report. <br />Page IV-19 (Section IV.D) <br />Corrected references to Illustrations. Removed reference to Map 81 which was <br />previously deleted. <br />Page IV-22 (Section IV.D) <br />Added discussion of maximum allowable slopes and target slopes. <br />Removed reference to reclamation schedule on Map 76. This information is covered in <br />Table V-7. <br />Minor text changes to avoid repagination. <br />Removed statement concerning the tops of the refuse areas having a one percent slope <br />toward the edges. <br />Added discussion of surface retention of moisture and minimization of ponding through <br />surface roughening to improve revegetation and reduce sediment generation. <br />Revised reference to maps and cross sections of refuse areas. <br />Page V-33 (Table V-7) <br />Table V-7 edited to modify projected dates for the reclamation of Refuse Areas 2/3/4 and <br />5a. Added note that these areas would be reclaimed once the design configurations are <br />complete.
The URL can be used to link to this page
Your browser does not support the video tag.