My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-03_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2009-06-03_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:15 PM
Creation date
6/4/2009 3:13:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/3/2009
Doc Name
Reclamation Cost Summary
From
DRMS
To
File
Type & Sequence
TR117
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 11 <br /> MT-6, Cost Summary <br />TASK LIST (DIRECT COSTS) Renewal 5 (2006) Midterm Review 6(2009) <br /> Former Task <br /> <br />New Task <br />task no. <br />Form <br />Task 2009 <br />Hours Direct <br />% Liability Task Hours Direct Cost <br />no. or Used Hours y cost (100% C ost (100% R emainin (Actual (Actual <br /> revision (CIRCES) Liability) g <br />Liability) Liability) Liability) <br />Refuse Pile Exoansfon and North Soil Storage Area <br />201 44 Demolish and remove all structures in RPE and NSS areas demolish n/a 0.87 $1,745 100% 0.87 $1,745 <br />202 111 Compact remaining coal on RPE compact 12.43 $ 2,125 <br />$217.28 <br />12.43 <br />$2,701 0 <br />100% <br />12.43 <br />$2,701 <br />203 115 Haul cover material to RPE loader 107.54 $ 85,088 n/a 107.99 $70,675 100% 107.99 $70,675 <br />204 109 Regrade RPE sediment control ditches dozer 0.25 $ 209 <br />$830.14 <br />0.25 <br />$208 <br />100% <br />0.25 <br />$208 <br />205 106 Remove RPE ponds dozer 36.61 $ 21,219 $830.14 36.61 $30,391 100% 36.61 $30,391 <br />206 102 Rip RPE road for reclamation ripper 0.12 $ 98 <br />$856.57 <br />0.12 <br />$103 0 <br />100% <br />0.12 <br />$103 <br />207 107 Pull up material for RPE road reclamation excavate 14.65 $ 2,013 $139.63 14.65 $2,046 100% 14.65 $2,046 <br />208 104 Regrade RPE road dozer 4.19 $ 3,431 <br />$830.14 <br />4.19 <br />$3,478 0 <br />100/0 <br />4.19 <br />$3,478 <br />209 110 Compact RPE road backfll ? compact 2.78 $ 475 $217.28 2.78 $604 100% 2.78 $604 <br />210 97 Replace topsoil from stockpile NSS to RPE loader 29.41 $ 23,270 n/a 29.42 $20,103 100% 29.42 $20,103 <br />211 116 Replace topsoil from stockpile to RPE area loader 50.70 $ 40,115 n/a 50.72 $34,609 100% 50.72 $34,609 <br />212 98 Replace topsoil from stockpile to RPE ponds loader 7.06 $ 5,415 n/a 7.16 $4,894 100% 7.16 $4,894 <br />213 99 Replace topsoil from stockpile to RPE road loader 1.53 $ 1,203 n/a 1.48 $1,014 100% 1.48 $1,014 <br />214 113 Regrade NNS pond dozer 0.40 $ 331 $830.14 0.40 $332 100% 0.40 $332 <br />215 112 Regrade NNS area dozer 16.91 $ 13,836 $830.14 16.91 $14,038 100% 16.91 $14,038 <br />216 108 Regrade NSS area entrance road dozer 0.07 $ 58 $830.14 0.07 $58 100% 0.07 $58 <br />217 114 Replace topsoil from stockpile to NSS area dozer 7.62 $ 6,238 $830.14 7.62 $6,326 100% 7.62 $6,326 <br />218 TR-113 Regrade Box Canyon North monitoring well dozer <br />$830.14 <br />0.28 <br />$232 ° <br />100% <br />0.28 <br />$232 <br />219 MR-354 Rip road and auger rig drill sites, approved MR-354 ripper $856.57 0.15 $128 100% 0.15 $128 <br />220 MR-354 Regrade light use road and auger drill sites, approved MR-354 dozer $830.14 0.83 $689 100% 0.83 $689 <br /> Total - Refuse Pile Expansion and North Soil Storage Area 294.93 $194,374
The URL can be used to link to this page
Your browser does not support the video tag.