Laserfiche WebLink
average calculation in section 2.2 for the Soil Erodibility Factor. Please <br />modify Table 2, Exhibit 7, Page 5 accordingly <br />3. The referenced text in Section 1.9, Base Flow, is still missing a reference to <br />the base flow included in the designs for the Prospect Pond. Please modify <br />the following text in the first paragraph of Section 1.9, Base Flow, on page 3, <br />specifically the text in bold, to read "A base flow of 0.15 cfs was used for the <br />Streeter and Prospect Pond designs." <br />This concludes the second adequacy review for Technical Revision 73. The proposed <br />decision date for this revision is currently 8 June 2009. Please extend the proposed <br />decision date 30 days. Colowyo's prompt response to this adequacy letter will ensure <br />meeting this new decision date. If you have any questions or comments regarding this <br />adequacy letter please call me at (303) 866-3567 X8145. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown