My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-09_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2009-03-09_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:13 PM
Creation date
6/4/2009 11:14:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
3/9/2009
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Light-Use Roads to Powerline Substation and Subsidence Monitoring Site <br />A light-use road and a permanent road will be used to access the substation. The light-use road will run 4,800 feet <br />to the substation and will follow the existing "fence" road. The light-use road will be designed per the <br />requirements of Rule 4.03.3, Light-Use Roads. The light-use road will be sufficiently maintained in order to assure <br />erosion control. Surfacing of the road will be adequate for the general use of the road, and will be compatible with <br />winter and spring, snow removal requirements. Access to the light-use road and substation will also require the <br />utilization of a permanent road approved by the CMLRD on February 3, 1988 (Technical Revision TR87-12; <br />Permit C-81-071). This permanent road runs 12,000 feet from Country Road #27 and is maintained under CYCC's <br />Permit C-81-071. The roads will be maintained by TCC. Upon substation removal, the light-use road will remain <br />as part of the approved postmining use of ranch management. The light-use and permanent road are shown on Map <br />39, Substation and Powerline Location. <br />A light-use road will be used to access a subsidence borehole meter at Mine 2 (MR89-37). The road will be <br />reclaimed on completion of the subsidence borehole metering. <br />6. Light-Use Road to 6MN Mine Water Storage Reservoir <br />A light-use road will access the 6MN Mine Water Storage Reservoir, for inspection and maintenance purposes. <br />The light-use road will run approximately 130 feet from the existing 6MN Ventilation Shag Installation access <br />road. The light-use road is designed per the requirements of Rule 4.03.3, Light-Use Roads, will be approximately <br />20 feet wide, with an overall grade of 0.7 percent, and is designed with a 6-inch compacted road-base base course, <br />and 3-inch gravel surfacing. The location of the road, and road configuration and cross-section, are shown on the <br />design drawings included in Exhibit 490. The light-use road will be maintained on a periodic basis to assure its <br />suitability for use and effective erosion control. Surfacing of the road will be adequate for the general use of the <br />road, and will be compatible with winter and spring, snow removal requirements. At such time as the 6MN <br />Reservoir is no longer needed, the light-use road will be removed and the associated disturbance area reclaimed. <br />7. Other Light-Use Roads <br />In addition to the above light-use roads, a number of other roads of this classification are located around the <br />property. The other roads include the following: Low Quality Coal Stockpile Road, West Gate Road, Fish Creek <br />Borehole Road, Escape Shaft/Borehole Site Road, EMD Dewatering Borehole Road, Lieske Substation Road, and <br />MET Station Road. All of these roads are shown on Map 24A and have been designed and constructed in <br />conformance with Rule 4.03.3. <br />General <br />No bridges are planned with this permit revision application. All culverts with an end area of less than 35 square <br />feet will be designed to pass, at a minimum, the 10-year, 24-hour event. Should a culvert with an end area greater <br />than 35 square feet be needed, it will be designed to safety pass the 20-year, 24-hour event. The culverts have also <br />been designed and constructed to sustain the vertical soil pressure, the passive resistance, and the weight of the <br />vehicles using the road. Trash racks and debris basins will be installed where needed to avoid plugging, collapse, <br />and erosion at culvert inlets and outlets. Culverts for road surface drainage were installed as specified in Rule <br />4.03.2(4)(e)(v). These culverts cross the road at not less than a 30-degree angle, and will be protected at the inlet <br />and outlet by rock riprap, if required. The culverts are covered by compacted fill to a depth of at least 1 foot. <br />No natural drainage channels will be altered with this permit revision application. All natural drainage channels <br />will be crossed using culverts of adequate size, so as not to affect the normal flow or gradient of the stream. <br />Drainage from the access/haulroad will meet the requirements of Rule 4.05. The roads have been constructed and <br />will be maintained to minimize erosion. The water-control systems have been designed to safely pass, at a <br />minimum, the peak runoff from a 10-year, 24-hour precipitation event. <br />MR09-236 2.05-74.2 02/23/09 <br />