My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-19_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2009-02-19_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:43 PM
Creation date
6/4/2009 10:45:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/19/2009
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) A plan for backfillins soil stabilizine compactin and adin with postmining contour maps and <br />appropriate cross-sections that are typical and representative of the anticipated character of the final surface <br />confiQUrat~on of the proposed permit area, m accordance with 4 14 for stream channel reconstruction in accordance <br />with 4.05.4, and for road removal or modification in accordance with 4 03 <br />RESPONSE <br />Portal Area <br />The rough grading of the spoils at the portal area will be accomplished by pushing the old spoil into the pit. Dozers <br />will be utilized to cover and rough grade the refuse area with spoil material. The material storage yard will be <br />restored by pushing the fill portion of the yard back into the cut area as shown on Cross-Sections B-B and C-C on <br />Map 25, Surface Area Cross-Sections. The access/haulroad will be regraded by pushing the fill portions into the <br />cut areas. The spoil material will be compacted, graded and stabilized by the equipment used to place the spoil <br />materials. Map 31, Postmining Topography, and Cross-Sections A-A, B-B, D-D, E-E, F-F, G-G, H-H and Y-1 on <br />Map 25, Surface Area Cross-Sections, show the final surface configurations in detail. The upland diversions are <br />shown on Map 25, Cross-Sections H-H and Y-Y. The designs for these channels are provided in Exhibit 8-R, <br />Grading operations will be conducted to reestablish an approximate original contour configuration and to avoid the <br />creation of long uninterrupted slopes. Since there are no steep slopes in the proposed permit area, cut and fill <br />terraces will not be installed. Grading will result in an undulating topography, thereby increasing moisture <br />infiltration, reducing runoff potential, and minimizing erosion. Topsoil will be distributed as shown on Map 29, <br />Reclamation. <br />Portal Sloae Heatine System <br />Upon completion of mining, the slope heating system will be dismantled and the small associated building will be <br />removed. The concrete pad will remain in place and will be buried during reclamation of the portal area. <br />~_ <br />MR07-226 2.05-99 ~~~~ ~T~?:~t~= ~ , a,V,r$~ 11/26/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.