Laserfiche WebLink
Unloading operations typically occur at the Haulroad B railroad crossing, where equipment access to the tracks is <br />available. Typically, unloading operations occur on the north side of the tracks, TCC will install apush-wall at this site <br />to facilitate the cleanup of coal in those instances where temporary ground storage is required. The push-wall will <br />consist of pre-formed concrete traffic barriers strategically placed to provide a backstop against which equipment can <br />operate to retrieve coal. <br />Additional measures will be implemented at this site to minimize sediment cohtributions to the adjacent Foidel Creek <br />stream channel. Drainage from the immediate azea of the temporazy coal storage site will be routed to an existing rock <br />filter as depicted on Map 24, and berms will be maintained at the site to ensure the rock filter is not bypassed. Buffer <br />zone signs will be erected at the site to assrue that personnel operating equipment in the area are aware of Foidel Creek. <br />Lastly, excess coal accumulations resulting from unloading operations will be removed in a timely fashion. <br />A second off-loading point will be established at the railroad crossing located just south of the Foidel School House. I- <br />beams wi}l be driven into the ground at this point with boards attached to create an L-shaped push-watt. I're-farmed <br />concrete traffic barriers will be placed in front of this wall to provide a backstop against which equipment can operate <br />to retrieve coal. Approximately 25 yards of compacted fill will be placed on the railroad track side of the I-beam <br />structure to provide a level surface for the off-loading and coal cleanup operations. Bonding modifications to address <br />the removal of this structure are presented in Appendix A, Volume IA. Excess coal accumulations resulting from <br />unloading operations at this site will be removed in a timely fashion. <br />(8j_._..__Coal_Processing_Waste and_Non-Coal_ProcessingWaste <br />A narrative explaining the construction, modification, use, maintenance removal and reclamation of coal <br />processing and non-coal waste removal handling storage transportation and disposal azeas and structures in the <br />permit_area_in_accordance_with_sections_4,_10_and_4:11._including appropriate_maps,_which_meet the_requirements_of <br />2 10,, explarnmgthe location of each_source of waste,_waste storage area,,and waste drsposal_facllity, <br />~~ <br />TR07-59 2.05-89.1 02/27/07 <br />