My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-19_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2009-02-19_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:43 PM
Creation date
6/4/2009 10:45:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/19/2009
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Coal-Handline -The coal dischazges from slope-belt at the portals through aflop-gate that can be used to <br />divert low-quality coal to the Low-Quality Coal Conveyer. Based on a maximum anticipated raw coal production <br />tonnage of 13.OMM tpy, approximately 2.OMM tpy of low-quality coal will be diverted to the Low-Quality Coal <br />• Conveyor, with the remaining 11.OMM tpy of Run-of--Mine (ROM) coal transferring to the ROM Coal Conveyor, <br />which carries to coal to the ROM Stacking Tube. Coal discharges through openings in the Stacking Tube to form <br />the ROM Coal Stockpile. Coal is reclaimed from the ROM Stockpile by a sub-grade reclaim system and <br />transferred to the elevated Crushing/Screening Building Feed Conveyor. The option exists that if downstream <br />portions of the coal-handling system aze inoperable due to break-downs or maintenance, coal can be recovered from <br />the ROM Stockpile by wheel-loader, loaded into trucks, and transferred by truck to the Batch-Weigh Coal <br />Stockpile for loading and shipment. The Crushing/Screening Feed Conveyor discharges to the Crushing/Screening <br />system where the coal passes through a series of double-deck screens which separate the coal stream into three size <br />fractions; an undersize fraction ('/z" x 0"), which passes through and dischazges directly to the Overland Conveyor; <br />an intermediate fraction (''/z" x 2"), which transfers to the Washplant Feed Conveyor; and the screen oversize (+2"), <br />which discharges to a roll crusher, with the crushed product transferring to the Washplant Feed Conveyor. Bypass <br />chute-work allows the intermediate and crushed products to be diverted directly to the Overland Conveyor, if plant <br />feed coal quality precludes the need for washing. <br />The Washplant Feed Conveyor transfers the intermediate and crushed coal products from the Crushing/Screening <br />Building to the Washplant II Building, where a series of screens, heavy-media cyclones, classifying cyclones, wash <br />screens, and centrifuges produce coarse and fine coal products, which are combined and dischazge to the Overland <br />Conveyor. Coazse refuse from the wash process is drained and transferred by the Coal Refuse Conveyor to the <br />Refuse Bin, where it is loaded into trucks and hauled to the existing permitted Coal Refuse Disposal Area. The fine <br />refuse passes to the Thickener, which partially dewaters the refuse and then discharges the fine coal refuse slurry to <br />the existing Thickener Underflow Line. The Thickener Underflow Line carries the fine refuse slurry through an <br />existing borehole to an area of sealed underground mine workings for disposal. <br />The Overland Conveyor carves the coal product stream to the Belt-Out-Back (BOB) area, where it passes through <br />the Primary and Secondary Crusher and Sampling Buildings (direct pass-through w/equipment removed or <br />bypassed). Anew Coal Sampling Station, to the west of Sedimentation Pond D, samples the product coal stream <br />on the Overland Conveyor. From the Sampling Building, the coal product stream can be routed to either the BOB <br />Coal Stockpile or the Batch-Weigh Coal Stockpile. Coal reclaimed from the BOB Stockpile is routed back through <br />the Sampling Building to the Batch-Weigh Coal Stockpile. From the Batch-Weigh Stockpile, coal can be <br />reclaimed by the Batch-Weigh Loadout Conveyor and/or the Truck Loadout Conveyor, allowing coal to be loaded <br />directly to either over-the-road trucks or unit trains for shipment. <br />Low-Ouality Coal Handline -The Low-Qulaity Coal Conveyor discharges to a temporary pile, and the low-quality <br />coal is then moved by wheel-loader to the Washplant I Grizzly Feeder. Coal is transferred from the Grizzly Feeder by <br />conveyor to the intermediate Washplant I Feed Stockpile. A sub-grade reclaim conveyor transfers the coal from this <br />stockpile to the Washplant I Building, where a series of screens, heavy-media cyclones, classifying cyclones, wash <br />screens, and centrifuges produce coarse and fine coal products. A portion of the washed coarse coal output <br />transfers by conveyor to the Stoker Coal Stockpile, where a Stoker Coal Loading Conveyor is used to load over- <br />the-road trucks. The remainder of the Washplant I clean coal output (both coarse and fine coal) can be routed to <br />either a small Clean-Coal Stockpile adjacent to the Washplant, or to the Overland Conveyor. Coarse and fine <br />refuse from Washplant I are handled in a manner similar to that previously described for Washplant II, with the <br />coarse refuse transferring by conveyor to a Refuse Bin for truck loading and haul to the Refuse Pile, and the fine <br />refuse passing through a Thickener, and then being dischazged to the Thickener Underflow Line for disposal in an <br />area of sealed underground mine workings. <br />Historical Information (Supercededl -Two sites previously existed for storage of underground development waste; <br />under and adjacent to the waste rock conveyor belt and in the fmal-cut pit. Construction of the Washplant I, completed <br />in 1995, eliminated the need to dispose oflow-quality coal and development waste in the pit or haul it to the refuse pile. <br />Instead, the Washplant allowed processing of these materials to recover the contained coal. The Washplant was <br />designed to produce a maximum of approximately 500,000 tons of clean coal per year during a normal operating <br />TR07-59 2.05-87 02/27/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.