My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-19_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2009-02-19_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:43 PM
Creation date
6/4/2009 10:45:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/19/2009
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bleeder Fan -The bleeder fan facility will require salvaging and stockpiling approximately 4,700 CY of topsoil <br />from the access road and the facility site. During the upgrading of the road, approximately 2,800 CY of topsoil will <br />be windrowed to the side of the road and left in place. The 1,200 CY that will be salvaged from the road extension <br />will be placed in the stockpile that will be established on the fan pad. In addition to the topsoil stockpiled from the <br />road extension, approximately 740 CY will be salvaged and stockpiled from the pad. The soil resources <br />information was derived from information presented in Exhibits 7 and 8, Soil Profile Description and Soil Mapping <br />Unit Descriptions, Map No. 19, Mine No. 3, Soils presented in permit C-84-062. These materials are incorporated <br />herein by reference. At the bleeder fan site, Twentymile will establish a test pit to verify topsoil depths prior to <br />salvaging topsoil. The stockpiled topsoil, which is located within the pad area, will be stabilized with the topsoil <br />stockpile stabilizing seed mixture. Prior to salvaging any topsoil from the site, a T & E species reconnaissance for <br />Ute Lady's Tresses, ~iranthes diuvialis, will be conducted, and the results forwarded to the Division. It is not <br />anticipated that this species will be found, as the site appears to be outside of its natural range. <br />18 Right Ventilation Shaft (TR04-441 <br />Approximately 4,400 feet of the access road crosses upland areas, with the remaining 2,700 feet crossing lowland <br />areas where road construction will involve removal of any large vegetation and stripping and stockpiling of other <br />vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area. Given an average <br />topsoil depth of approximately 6 inches in the upland area and a total road disturbance area of approximately 5.7 <br />acres, approximately 4,600 cubic yards of topsoil will be salvaged from the road corridor, and 2,000 cubic yards <br />from the 2.5 acre pad area. Prior to initiating topsoil removal activities, stream/wetland buffer zones will be <br />marked with identifying signs to prevent surface disturbance within buffer zone areas. The topsoil from the road <br />corridor was initially windrowed adjacent to the road and topsoil from the pad area was placed in a stockpile <br />adjacent to the shaft pad and within the road corridor, for future reclamation use. As a result of concerns related to <br />protection of windrowed topsoil from erosion and contamination, a decision was made to recover topsoil from the <br />windrows and place it in stockpile. The topsoil salvage volumes are indicated on Table 49A. Seeding with the <br />topsoil stockpile stabilization seed mixture identified on page 2.05-121 will stabilize the windrowed and stockpiled <br />topsoil. <br />6-North Mains Ventilation Shaft (TR05-48) <br />Along the 2,930-foot access road, construction will involve removal of any large vegetation and stripping and <br />stockpiling of other vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area. <br />Given an average topsoil depth of approximately 6 inches in the upland area and a total road disturbance area of <br />approximately 2.4 acres, approximately 1,940 cubic yards of topsoil will be salvaged from the road corridor, and <br />8,954 cubic yards from the 11.1 acre pad area. Prior to initiating topsoil removal activities, wetland buffer zones <br />will be marked with identifying signs to prevent surface disturbance within the buffer zone areas. The topsoil from <br />the road corridor will be recovered and placed in a stockpile at the north end of the road corridor beyond the edge <br />of the 35-foot road disturbance area, and topsoil from the pad area will be placed in a stockpile within the shaft pad <br />on the southwest edge of the pad for future reclamation use. The topsoil salvage volumes are indicated on Table <br />49A. Natural vegetative materials (mulch) incorporated into the topsoil, and seeding with the topsoil stockpile <br />stabilization seed mixture identified on page 2.05-121 will stabilize the stockpiled topsoil. <br /> <br />MR07-224 2.05-84.3 10/17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.