Laserfiche WebLink
11111 <br />• <br />• <br />UJ <br />3. Assist the mine personnel with design and implementation of a system <br />for monitoring the stability of the slope during slope stabilization and <br />reclamation work. <br />LIMITATIONS <br />The recommendations and conclusions presented in this report were <br />prepared based upon conditions disclosed by review of information provided, our <br />geologic reconnaissance, and our experience. Variations in the subsurface <br />conditions not indicated by the available information are likely and should be <br />expected. <br />We believe this report was prepared using the standards of care normally <br />used in this area at this time. No warranty, express or implied, is made. <br />Should you have any questions regarding the contents of this report or the <br />project from a geotechnical point-of-view, please call. <br />CTL ITHOMPSO'••""••% <br />1,ND <br /> <br />Thomas A. Ter G., P.E. <br />Geological Engi .h_ <br />Reviewed by: <br />149 0. 40?W04'k ) IV, <br />William C. Hoffmann, Jr., P.E. <br />Senior Principal Engineer <br />TAT:WCH:kis <br />(6 copies sent) <br />6 <br />TRANSIT MIX AGGREGATES <br />PIKEVIEW QUARRY SLOPE <br />CTLIT PROJECT NO. CS17341-125 <br />S:1CS17000-174991CS17341.000112512. Reports1CS17341-125-R1-Final.doc <br />21