Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task # : 30e State : Colorado <br />Date : 0512612009 County :Montrose <br />User: SLB Site : New Horizon Mine <br />sheet 1 of 2 <br />Permit or other job action : Permit Renewal No. 5 <br />Task description :Replace topsoil on 87.75 ac WFC property <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 631G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader :I NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />% Utilization-machine : 78 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $78.78 $62.35 NA NA NA NA <br />Operating cost/hour : $97.39 $103.27 NA NA NA NA <br />Ripper op. cost/hour : NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $201.12 $198.40 NA NA NA NA <br />Number of units : 4 2 0 0 0 0 <br />Group subtotals : Work : $1,201.30 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 674,817 CCY factor: 1.100 volume <br />$1,201.30 <br />742,299 LCY <br />Source of quantity take-off :Map 2.05.4-4, 18.3" A/B, 38.9" sub <br />Source of estimated swell factor :Division estimate <br />Permit/job #: C-1981-008 <br />Abbreviation : none <br />Filename :0008-30e