My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-02_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-06-02_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:12 PM
Creation date
6/3/2009 9:25:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/2/2009
Doc Name
Revised Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN5
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 006 Support Equipment SLB <br />C-1981-008 New Horizon Mine 05/28/09 <br />Permit Rewal No. 5 <br /> <br /> <br /> <br /> <br />ask <br />No. <br /> <br /> <br /> <br />ask Description <br /> <br /> <br />otal <br />Hours D9R - <br />Load <br />Support - <br />$198.40/ <br />hr <br /> <br /> <br /> <br />ost D9R <br />Dump <br />Support - <br />$198.40/ <br />hr <br /> <br /> <br /> <br />ost 14H - <br />Road <br />Maint. - <br />$119.29/ <br />hr <br /> <br /> <br /> <br />ost <br />H2O <br />Truck - <br />$130.35/ <br />hr <br /> <br /> <br /> <br />ost <br /> <br /> <br /> <br />otal Cost <br /> <br /> <br /> <br />omments <br />1 Drill/shoot highwall 52.16 13.04 $2,587.14 $0.00 $0.00 $0.00 $2,587.14 Dozer 25% to prepare drilling area <br />4 Drill/shoot ramp 6.7 1.675 $332.32 $0.00 $0.00 $0.00 $332.32 Dozer 25% to prepare drilling area <br /> <br />5 <br />Haul boxcut spoil <br />157.9 <br />78.95 <br />$15,663.68 <br />31.58 <br />$6,265.47 <br />78.95 <br />$9,417.95 <br />78.95 <br />$10,291.13 <br />$41,638.23 Dozer 50% load, 20% dump, road <br />maintenance 50% <br />30a Topsoil 51.62 ac Morgan 137.69 $0.00 $0.00 68.85 $8,213.12 68.85 $8,974.60 $17,187.71 Road maintenance 50% <br />30b Topsoil 56.34 ac Morgan 271.09 $0.00 $0.00 135.545 $16,169.16 135.545 $17,668.29 $33,837.45 Road maintenance 50% <br />30c Topsoil 57.75 ac Benson 195.73 $0.00 $0.00 97.865 $11,674.32 97.865 $12,756.70 $24,431.02 Road maintenance 50% <br />30d Topsoil 81.47 ac Lloyd 380.9 $0.00 $0.00 190.45 $22,718.78 190.45 $24,825.16 $47,543.94 Road maintenance 50% <br />30e Topsoil 87.75 ac WFC 241.14 $0.00 $0.00 120.57 $14,382.80 120.57 $15,716.30 $30,099.09 Road maintenance 50% <br />30f Topsoil 4.68 ac WFC 24.05 $0.00 $0.00 12.025 $1,434.46 12.025 $1,567.46 $3,001.92 Road maintenance 50% <br />31 Topsoil 9.93/8.67 ac 11.04 $0.00 $0.00 5.52 $658.48 5.52 $719.53 $1,378.01 Road maintenance 50% <br /> <br /> <br /> <br /> <br /> <br />36a Topsoil 1.81/2.82 ac 3.39 $0.00 $0.00 1.695 $202.20 1.695 $220.94 $423.14 Road maintenance 50% <br /> <br /> <br /> <br />41 Topsoil 3.99 ac 5.77 $0.00 $0.00 2.885 $344.15 2.885 $376.06 $720.21 Road maintenance 50% <br /> <br /> <br />45 Topsoil BB Detour 6.44 $0.00 $0.00 3.22 $384.11 3.22 $419.73 $803.84 Road maintenance 50% <br />46 Topsoil 12.45 ac 24.5 $0.00 $0.00 12.25 $1,461.30 12.25 $1,596.79 $3,058.09 Road maintenance 50% <br /> <br /> <br />49 Topsoil 26.93 ac 41.84 $0.00 $0.00 20.92 $2,495.55 20.92 $2,726.92 $5,222.47 Road maintenance 50% <br />50 Topsoil 6.69 ac 10.35 $0.00 $0.00 5.175 $617.33 5.175 $674.56 $1,291.89 Road maintenance 50% <br />82 Haul BB pavement 2.17 $0.00 $0.00 1.085 $129.43 1.085 $141.43 $270.86 Road maintenance 50% <br />83 Haul BB fill 5.2 $0.00 $0.00 2.6 $310.15 2.6 $338.91 $649.06 Road maintenance 50% <br />92 Compact BB road 75.2 $0.00 $0.00 $0.00 18.8 $2,450.58 $2,450.58 Water truck 25% <br />93 Compact 2700 road 28.8 $0.00 $0.00 $0.00 7.2 $938.52 $938.52 Water truck 25% <br /> <br /> 1682.1 93.665 $18,583.14 31.58 $6,265.47 759.605 $90,613.28 785.605 $102,403.61 $217,865.50
The URL can be used to link to this page
Your browser does not support the video tag.