My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-02_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-06-02_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:12 PM
Creation date
6/3/2009 9:25:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
6/2/2009
Doc Name
Revised Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN5
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task # : 05C State : Colorado Permit/job # : C-1981-008 <br />Date : 0512612009 County:Montrose Abbreviation :none <br />User : SLB Site : New Horizon Mine Filename :0008-05c <br />Permit or other job action : Permit Renewal No. 5 <br />Task description :Haul boxcut spoil (Mt. Nucla) to pit <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />l Eauioment Descriotion <br />Truck/loader team -Truck :Cat 773D (2002) <br />-Loader : CAT 988G (2005) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 100 77 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $52.49 $65.37 NA NA NA NA <br />Operating cost/hour : $88.21 $65.20 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $21.72 $32.96 NA NA NA NA <br />Unit subtotals : $162.42 $163.53 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $813.20 Support : $0.00 Maintenance : $0.00 <br /> Total work team cost/hour : $813.20 <br />MATERIAL QUANTITIES _ <br />Initial Swell Loose <br />volume : 79,529 CCY factor : 1.165 volume : 92,651 LCY <br />Source of quantity take-off :Operator estimate - Task 1 <br />Source of estimated swell factor : Division Estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,900 pounds/LCY Struck volume : 33.80 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity: 37.26 LCY Adjusted volume*: 37.26 LCY <br />Final truck volume based on number of loader passes : 36.08 LCY <br />truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.): -5,700 <br />Rated capacity (nom. heaped) : 8.200 LCY Truck Loader Source <br />Descr.: Other - rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 9.020 LCY Net correction : 0.830 0.830
The URL can be used to link to this page
Your browser does not support the video tag.