Laserfiche WebLink
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 02-Jun-2009 Permit or job no. C-1981-008 Site : New Horizon Mine <br />User : SLB Abbreviation : none State :Colorado <br />Task : 00h Filename : 0008-00h County :Montrose <br />Agency or organization name : CDRMS <br />Permit or job action :Permit Renewal No. 5 <br />Task description :Reclaim/Reestablish Roads <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />081 -Rip 88 Road Detour ripper 1 7.4 $1,631 <br />082 -Haul BB Road pavement to pit scraperl 1 2.1 $2,267 <br />083 -Haul BB Road Detour material to pit scraperl 1 5.2 $4,997 <br />084 -Rip NE Haul Road surface ripper 1 6.5 $1,400 <br />085 -Regrade NE Haul Road corridor dozer 1 25.21 $5,001 <br />086 -Rip SW Haul Road Surface ripper 1 7.3 $1,579 <br />087 -Regrade SW Haul Road surface material dozer 1 28.8 $5,715 <br />088 -Rip 5th Street surface ripper 1 1.4 $313 <br />089 -Regrade 5th Street surface material dozer 1 5.6 $1,127 <br />090 -Place and compct BB Road gravel and pavement NA 1 120.0 $403,746 <br />091 -Place and compact 2700 Road gravel and pavement NA 1 80.0 <br />1 <br />$247,82 <br />092 -Compact 15'native material on new BB Road compact 1 75.2 $13,464 <br />093 -Compact 15' native material on new 2700 Road compact 1 28.8 $5,157 <br />094 -Construct roadside ditches on new 88 Road grader 1 18.3 $2,135 <br />095 -Construct roadside ditches on new 2700 Road grader 1 7.5 $874 <br />096 -Finish grade 88 Road Detour corridor grader 1 7.3 $850 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 427.1 $698,077