Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : 02-Jun-2009 <br />User : SLB <br />Task : 00f <br />Site : New Horizon Mine <br />State : Colorado <br />County :Montrose <br />Agency or organization name : CDRMS <br />Permit or job action : Permit Renewal No. 5 <br />Task description :Reclaim Hydrologic Structures/Reestablish Drainage <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />051 -Pond 009 dozer 1 23.3 $4,636 <br />052 -Pond 010 dozer 1 26.5 $5,266 <br />053 -Pond 011 dozer 1 40.3 $8,003 <br />054 -Pond 012 scraperl 1 20.61 $4,089 <br />055 -Pond 013 dozer 1 35.1 $6,976 <br />056 -Pond 014 dozer 1 8.6 $1,710 <br />057 -Diversion/Collection ditches dozer 1 300.4 $20,333 <br /> <br /> <br />51b -Replace topsoil on Pond 009 scraperl 1 2.11 $1,258 <br />52b -Replace topsoil on Pond 010 scraperl 1 2.9 $1,752 <br />53b -Replace topsoil on Pond 011 scraperl 1 6.2 $3,738 <br />54b -Replace topsoil on Pond 012 scraper1 1 1.8 $1,098 <br /> <br />56a -Replace topsoil on Pond 014 dozer 1 0.1 $101 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 468.4 $58,960 <br />CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />Permit or job no. C-1981-008 <br />Abbreviation : none <br />Filename : 0008-00f