Laserfiche WebLink
Bowie No. 2 Mine C-1996-083 <br />Uinnr Qo. Ai ;-n I fNA <br />PROJECT IDENTIFICATION <br />Date : 01-Jun-09 Permit C-1996-083 Site: Bowie No. 2 Mine <br />User: JRS State : Colorado <br /> Filename: C083-350 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Minor Revision 104 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />351 Regrade Drill Pad 192 10.69 $2,219 <br />352 Regrade New Road Spur to Drill Pad 192 27.79 $5,768 <br />353 Replace Topsoil from Stockpile to Drill Pad 192 5.75 $1,194 <br />354 Replace Topsoil from Stockpile New Road Spur to Drill Pad 192 14.55 $3,020 <br />355 Reseed Drill Pad 192 2.10 $1,437 <br />356 Reseed New Road Spur to Drill Pad 192 5.40 $3,695 <br /> <br /> Direct Cost Total 66.28 $17,333 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $269 <br /> Performance Bond (1.05% of Direct Costs) $182 <br /> Job Superintendent (at $42.25/hour) 33.14 $1,400 <br /> Profit (10.00% of Direct Costs) $1,733 <br /> <br /> <br /> Total Overhead and Profit $3,584 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $20,917 <br /> <br /> <br /> Legal - Engineering - Project Mana ement <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $889 <br /> Reclamation Management and Administration (3.25% of Contract) $680 <br /> <br /> <br /> TOTAL BOND AMOUNT $22,486 <br />jrs Page 1 01-06-09