Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 342 <br />Date : 0610112009 <br />User : JRS <br />Permit/job# : C-1996-083 <br />Abbreviation :none <br />Filename : C083-342 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Minor Revision 106 <br />Task description : Regrade Light-Use Road Extension to Drill Pad 177 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank riDDer <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 700 8CY factor : 1.250 volume : 875 LCY <br />.Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.90 (Cat HB) <br /> <br />Average push gradient : <br />5.00 % (Dos) <br />Altitude : <br />1.00 _ <br />(Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 Ibs/LCY Net correction : 0.32 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 292.33 LCY/hr <br /> Adjusted fleet production : 292.33 LCY/hr <br />JOB TIME AND COST - <br />Fleet size : 1 Dozer(s) Total job time : 2.99 Hours <br />Unit cost : $0.710 /LCY Total job cost : $621 <br />CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine