My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-01_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-06-01_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:09 PM
Creation date
6/2/2009 10:53:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
6/1/2009
Doc Name
Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
MR106
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />Minnr RPvisinn 1 nR <br />-------- --- <br />PROJECT IDENTIFICATION ------- --- <br />Date : 01-Jun-09 Permit C-1996-083 Site: Bowie No. 2 Mine <br />User: JRS State : Colorado <br /> Filename: C083-340 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Minor Revision 106 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />331 Plug and Seal Four Gob Vent Boreholes 48.00 $26,541 <br />332 Regrade Light-Use Road Extension to Drill Pad 177 2.99 $621 <br />333 Replace Topsoil from Stockpile to Light-Use Road Extension 1.61 $334 <br />334 Reseed Light-Use Road Extension 0.58 $397 <br /> <br /> <br /> Direct Cost Total 53.18 $27,893 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $432 <br /> Performance Bond (1.05% of Direct Costs) $293 <br /> Job Superintendent (at $42.25/hour) 26.59 $1,123 <br /> Profit (10.00% of Direct Costs) $2,789 <br /> <br /> <br /> Total Overhead and Profit $4,638 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $32,531 <br /> <br /> <br /> Le a 1- En ing eering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $1,383 <br /> Reclamation Management and Administration (3.25% of Contract) $1,057 <br /> <br /> <br /> <br /> TOTAL BOND AMOUNT $34,971 <br />jrs Page 1 01-06-09
The URL can be used to link to this page
Your browser does not support the video tag.