My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-29_REVISION - M1977129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977129
>
2009-05-29_REVISION - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:18:58 PM
Creation date
6/1/2009 2:44:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
REVISION
Doc Date
5/29/2009
Doc Name
TR approval
From
DRMS
To
Whitewater Building Materials Corporation
Type & Sequence
TR4
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..: <br /> <br />HOURLY PRODUCTION <br />_.. .., <br /> <br />sheet 2 of 2 <br />Haulinq Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,400 pounds/LCY Struck volume : 23.20 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Clay and gravel - Dry Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds Adjusted capacity : 28.60 LCY <br />Payload capacity : 34.17 LCY *** hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 4,600 _ <br /> Scraper Push dozer Source <br />Scraper loading time 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,500 0.00 5.00 5.00 1375 1.21 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 1.21 minutes <br />minutes <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.68 minutes <br />Unadjusted unit production/hour : 465.80 LCY/hour *** Adjusted for job conditions : 386.62 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 773.24 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 773.24 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 39.29 Hours <br />Unit cost : $0.966 /LCY Total job cost : $29,359 <br /> <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.87 <br />table velocities are max. attainable per total resistance shown, not average
The URL can be used to link to this page
Your browser does not support the video tag.