Laserfiche WebLink
SHRUBS AND TREES (seed) : <br />Seed application method : Drill seeding (DMG survey data) TOTAL SEED APPLICATION COST / ACRE : $76.78 <br /> <br />MULCHING and MISCELLANEOUS <br /> <br />Materials - item Straw, delivered {DMG survey data} <br />no. 1 <br />1.50 <br />ton <br />$102.28 <br />$153.42 <br />item no. 2 <br />item no. 3 <br />item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT COST J UNIT COST /ACRE <br /> <br />Herbicide - Curtail @ 8.0 pt/ac 1.00 acre $62.64 $62.64 <br /> <br /> <br />TOTAL MULCH MATERIALS COST/ ACRE : $216.06 <br />Application - method no. 1 : Power mulcher (MEANS 32 91 13.16 0700) $65.78 <br />method no. 2 : Crimping, with tractor (DMG survey data) $57.07 <br />method no. 3: Weed spray, truck, non-aquatic area, nox. [DMG] $52.13 <br />TOTAL MULCH APPLICATION COST / ACRE : $174.98 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. /ACRE (planting cost data source) COST / PLANT COST / PLANT PELLET COST/PLANT COST/ACRE <br />Cottonwood, Narrowleaf 2 Tubling, 10 cu. in. container (BRI) $1.19 $1.19 $2.40 $4.78 $9.56 <br />Willow, Sandbar 21 Tubling, 10 cu. in. container (BRI) $1.11 $1.19 $2.40 $4.70 $98.70 <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST I ACRE : $108.26 <br />JOB COST No. of acres : 23.00 Cost / acre : $897.51 INITIAL JOB COST : $20,642.78 <br />Estimated failure rate (percent) : 30.00% Cost / acre*: $897.51 RESEEDING JOB COST : $6,192.84 <br />* Selected replanting work items : F T S M N TOTAL JOB COST : $26,836 <br />* TOTAL SEEDS / SO. FT.: 35.9 * TOTAL POUNDS PLS / ACRE : 13.40 * TOTAL SEED MIX COST / ACRE : $149.94 <br />FORBS : sheet 2 of 2