Laserfiche WebLink
FORBS : sheet 2 of 2 <br />SHRUBS AND TREES (seed) : <br />Seed application method : Drill seeding (DMG survey data} TOTAL SEED APPLICATION COST I ACRE : $76.78 <br /> <br />MULCHING and MISCELLANEOUS <br /> <br />Materials - item no. Straw, delivered {DMG survey data} <br />1 <br />1.50 <br />ton <br />$102.28 <br />$153.42 <br />item no. 2 <br />item no. 3 <br />item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT COST /UNIT COST /ACRE <br /> <br />Herbicide - Curtail @ 8.0 ptlac 1.00 acre $62.64 $62.64 <br /> <br /> <br />TOTAL MULCH MATERIALS COST / ACRE : $216.06 <br />Application - method no. 1 :Power mulcher (MEANS 32 91 13.16 0700) $65.78 <br />method no. 2 : Crimping, with tractor (DMG survey data) $57.07 <br />method no. 3: Weed spray, truck, aquatic area, nox. [DMG] $52.13 <br /> TOTAL MULCH APPLICATION COST / ACRE : $174.98 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. / ACRE (planting cost data source) COST / PLANT COST / PLANT PELLET COST / PLANT COST / ACRE <br />Currant, Squaw or Wax 2 Tubling, 10 cu. in. container (BRI} $1.24 $1.19 $2.40 $4.83 $9.66 <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST / ACRE : $9.66 <br />.. <br />JOB COST No. of acres : 14.50 Cost/ acre : $798.91 INITIAL JOB COST : $11,584.23 <br />Estimated failure rate (percent) : 30.00% Cost / acre": $789.25 RESEEDING JOB COST : $3,433.25 <br />" Selected replanting work items : F T S M TOTAL JOB COST : $15,017 <br />TOTAL SEEDS / SQ. FT.: 35.9 ' TOTAL POUNDS PLS / ACRE : 13.40 " TOTAL SEED MIX COST I ACRE : $149.94