Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />.. <br />...:.. <br />PROJECT IDENTIFICATION <br />Date 23-May-2009 Permit or job no. M-1988-021 Site : Soward Ranch Pit <br />User : RCO <br />Abbreviation <br />Filename <br />none <br />M021-000 <br />Agency or organization name : DRMS <br />Permit or job action : Routine recalculation <br />..... <br />TASK .. _ ............ <br />LIST (DIRECT COSTS) <br />FORM <br />FLEET <br />TASK <br />DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Reduce highwall to 3:1 dozer 1 2.81 $470 <br />002 -Grade processing area dozer 1 8.5 $1,420 <br />003 -Rip compaction in pit floor ripper 1 3.7 $656 <br />004 -Spread topsoil dozer 1 12.1 $2,033 <br />005 -Revegetate disturbed area revege 1 8.0 $3,008 <br />006 -Haul reclamation equipment to and from site mobilize 1 3.2 $842 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 38.4 $8,429 <br />* includes inflation factor adjustment of NA % TOTAL DIRECT COST • - $8,429 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $170 <br />Performance bond : 1.05 % of direct total = $89 <br />Job superintendent : NA" NA NA total = NA <br />Profit : 10.00 % of direct total = $843 <br />not required (or eqp. operator serves as super.) TOTAL 0 & P = $1,102 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $9,531 <br />Financial warranty processing (legal/related costs) 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $477 <br />CONTINGENCY- NA* NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $2,078 <br />TOTAL BOND AMOUNT (direct + indirect) _ $10,507 <br />State : Colorado <br />County :Mineral