Laserfiche WebLink
CIRCES Cost'Estimating Software <br />Permit or other job action :Routine Recalculation <br />. Task description :Haul reclamation <br />EQUIPMENT TRANSPORT RIG COST <br />Truck tractor description <br />Truck trailer description <br />Cost Breakdown : <br />NON-ROADA13LE EQUIPMENT <br />t to and from site <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51 + Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Reveg equipment 8.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $274.44 $214.12 $0.00 <br />Agency or organization name: DRMS <br />Task # : 006 State :Colorado Permit/job #:M-1988-021 <br />Date : 0512312009 County :Mineral Abbreviation :none <br />User : RCO Site : Soward Ranch Pit Filename :M021-006