My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-23_INSPECTION - M1988021
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1988021
>
2009-05-23_INSPECTION - M1988021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:53 PM
Creation date
5/29/2009 8:23:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988021
IBM Index Class Name
INSPECTION
Doc Date
5/23/2009
Doc Name
Inspection report
From
DRMS
To
Soward Ranch LLC
Inspection Date
5/1/2009
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2:3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $167.03 Total fleet cost/hour : $167.03 <br /> <br />MATERIAL QUANTITIES .... ..... ........... <br />Initial Swell Loose <br />volume : 2,823 LCY factor : NA volume : 2,823 LCY <br /> <br />Source of estimated volume: 3.5 ac x 6 in depth <br />Source of estimated swell factor :program <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (a vg.) <br />Average push distance : 200 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,900 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 231.91 LCY/hr <br /> Adjusted fleet production : 231.91 LCY/hr <br /> <br />.::......: <br />JOB TIME AND COST ... ....... ......... ...... <br />Fleet size : 1 Dozer(s) Total job time : 12.17 Hours <br />Unit cost : $0.720 /LCY Total job cost : $2033 <br /> <br />Shift basis : 1 per day
The URL can be used to link to this page
Your browser does not support the video tag.