Laserfiche WebLink
RECEPTION#: 624796, 0411712008 at <br />08:31:10 AM,1 OF 7, R $36.00 <br />United States De artm ANN EDDINS, DELTA COUNTY, CO <br />p CLERK AND RECORDER <br />BUREAU OF RECLAMATION TAKE PRIM' <br />ti 1?R` Ik4w Colorado Regional Office 'NQMrLFttCA <br />Western Colorado Area Office <br />IN RMY REFER i0: <br />2764 Compass Drive, Suite 106 835 E 2"d Avenue, Suite 300 <br />Grand Junction, CO 81506.8785 Durango, CO 81301 5475 <br />WCG-SCoverly Contract No. 08-LAI-4A-00030 <br />LND-6.00 / d x / oIA0-1rl- do- 31871SY'000 6 <br />LETTER OF CONSENT <br />Mr. I4rilliam A. Bear, Jr. <br />Bowie Resources Ll_C <br />P. O. Box 483 <br />Paonia, Colorado 81428-0483 <br />Subject: Install, own, operate and maintain two Corrugated Metal Pipes (CMP) across the Fire Mountain <br />Canal, (:Bowie Mine N6.2 - Technical Revision 49), Paonia Project, Colorado <br />Dear Mr. Bear: <br />This letter is pursuant to your request to install two (2) CMP structures across the Fire Mountain Canal (Canal) <br />to be located on each side of Consentee's existing bridge. The enclosed Exhibit A shows the approximate <br />location of this crossing. <br />As you !crow, the Canal is a Federal facility operated and maintained by the North Fork Water Conservancy <br />District (District) and the Fire Mountain Canal and Reservoir Company (Company). The Canal and its <br />associated operation & maintenance (O&M) road right-of-way were obtained when the United States acquired <br />and enlarged the Fire. Mountain Canal. <br />The CMP installation crosses a Federal right-of-way (ROW) which is approximately 30 feet wide from <br />centerline on the north side and approximately 33 feet wide from the centerline on -le south side. This ROW <br />is located in the SW '% of NE Y. of Section 15, Township 13 South, Range 91 West, 6`s P.M. This easement <br />was purchased on October 7, 1949 from Nobel A. & Alma E. Baker by the authority of the Canal Act of 1890. <br />The United States, through Reclamation, does not object to the installation of the two CMPs across the Canal <br />and O&M road provided such use does not interfere in any way with the right acquired or reserved by <br />Reclamation and you, as Consentee, agree to the following conditions: <br />1. The purpose of the two CMPs is to convey non polluted surface runoff water which may occur after <br />a storm event:. The CMPs. shall be built and maintained so as not to allow any surface runoff water to <br />enter or leek :into the Canal. These two CMPs are to be attached to each side of bridge and not <br />interfere with. O&M road traffic. <br />2. The two GWPs will be installed so as not to block or prevent vehicle usa;;e of the O&M roads. The <br />Consentee will pro-tide Reclamation with as-built drawings within two morths of completion of <br />installation. The placement for the two CMPs will be. located to give at least 18-inches of clearance <br />above the high water level in the Canal when crossing the Canal prism. <br />Ile <br />I. <br />11