Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 N 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />May 26, 2009 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />MAY ? 6 2009 <br />J. J. Dudash 01VISjun U; :-reclamation, <br />Division of Reclamation, Mining and Safety Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />TR-49, Proposed new haul road to Gob Pile # 3 <br />Adequacy Review No. 2 <br />Permit C-1996-083 <br />Dear Mr. Dudash: <br />The DRMS' letter dated December 19, 2007, transmitted its adequacy comments <br />regarding the referenced technical revision. Following are Bowie Resources responses <br />to the DRMS' comments and concerns: <br />2. Bowie owns existing 4365 Lane. The 4369 Lane reference was incorrect. <br />3. Enclosed is copy of the Bureau of Reclamation Letter of Consent for the Easement <br />across the Fire Mountain Canal for an existing bridge and two CMP pipe crossings. The <br />Letter of Consent should be inserted into Volume IIIA, Tab 13, Other Permits. <br />4. The amended Construction Permits have not been received. <br />15. Pages Exh-8-180iv and 180v are enclosed. <br />18. Appendix B is enclosed. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />J.E. Stover <br />Consulting Engineer <br />Cc: Bill Bear <br />Enclosures: <br />Volume III: Exh-8-180iv & 180v <br />Volume IIIA: BOR Letter of Consent <br />Volume XI: Appendix B