My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-25_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2009-05-25_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:54 PM
Creation date
5/28/2009 3:21:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
5/25/2009
Doc Name
Proposed Decision Form
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF' Soto <br />Q <br />** COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />"?g76' 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Reclamation, Mining and Safety, in accordance with C.R.S. <br />34-33-109(7), proposes to Approve the renewal of a permit to conduct surface coal mining and <br />reclamation operations at the Eagle Mine Complex, Permit No. C-1981-044. <br />This decision is based on a review of the complete and accurate application and the existing permit, <br />including all conditions and revisions approved up to May 22, 2009. In accordance with C.R.S. <br />34-33-109(7)(a), the Division makes the following determinations which warrant that the permit be <br />renewed: <br />1. The terms and conditions of the valid, existing permit are being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et <br />seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially jeopardize the permittee's continuing <br />responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for the operation <br />will continue in full force for the proposed period of renewal as well as any additional <br />bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to BTU Empire Corporation meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be for a <br />term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Director <br />-0 Ls <br />Date <br />m:\oss\ahd\temp\c-m-15_c 1991044;rs_05222009030130.doc <br />?tio9
The URL can be used to link to this page
Your browser does not support the video tag.