My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-21_REVISION - M1977140
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977140
>
2009-05-21_REVISION - M1977140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:45 PM
Creation date
5/28/2009 1:30:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977140
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
TR approval & recalculated bond amount
From
DRMS
To
Mathias Concrete, Inc.
Type & Sequence
TR3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> WHEEL LOADER - LOAD AND CARRY WORK <br />.:.:... <br /> <br />PROJECT IDENTIFICATION ............ <br />. <br />,....... <br />Task #: 004 State : Colorado Permit/job #: M-1977-140 <br />Date : 0512112009 County : Rio Grande Abbreviation :none <br />User : RCO Site : North Farm Road Pit #1 Filename : M140-004 <br /> <br />Agency or organization name : DRMS <br />Permit or other job action : TR-3 <br />Task description : Carry topsoil to be spread <br /> <br />HOURLY EQUIPMENT COST Basic machine : CAT 95OG high lift (2002) Horsepower : 180 <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $21.07 NA <br /> Operating cost/hour : $30.76 100 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $84.61 Total fleet cost/hour : $84.61 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 4,840 LCY factor : NA volume : 4,840 LCY <br />Source of quantity take-off : 6 ac x 6" depth <br />Source of estimated swell factor : NA <br />.. ... <br />HOURLY PRODUCTION (Cat HS) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : No adjustment - factor not applicable 0.000 (Cat HB) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : -0.040 minutes <br />Adjusted basic cycle time : 0.510 minutes <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 600 0.00 5.00 5.00 0.5586 (Cat HB) <br />Return route : 600 0.00 5.00 5.00 0.4899 (Cat HB) <br /> Total travel time : 1.0485 minutes <br />Loader Bucket CaoaciN Total cycle time : 1.558 minutes <br />Rated capacity : 3.75 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.050 Other - moist loam (100-110%) <br />Adjusted capacity : 3.94 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HS) <br />Site altitude : 7,600 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 151.59 LCY/Hr <br />Adjusted hourly unit production : 125.82 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 125.82 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 38.47 Hours <br />Unit cost : $0.672 /LCY Total job cost : $3,255
The URL can be used to link to this page
Your browser does not support the video tag.