Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />IPMENT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 007 State :Colorado <br />Date : 0512112009 County : Rio Grande <br />User : RCO Site :North Farm Road Pit #1 <br />sheet 1 of 2 <br />Permit or other job action : Tr-3 <br />Task description :Haul reclamation <br />t to and from site <br />... ... .............. . <br />EQUIPMENT TRANSPORT RIG COST <br /> <br />Shift basis : <br /> <br />er a <br />per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51 + Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />A1nK1_0nenAQ1 P Gni IIPMFAIT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series !1- 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-Cat 320C 21.72 $26.76 $88.67 1 $115.43 $88.67 $0.00 <br />excavator w/hammer <br />to break concrete <br />-CAT 950G high lift (2002) 21.14 $21.07 $88.67 1 $109.74 $88.67 $0.00 <br />-reveg equipmt 8.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $499.61 $391.46 $0.00 <br />Permit/job #:M-1977-140 <br />Abbreviation :none <br />Filename :M140-007