My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-15_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-04-15_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:37 PM
Creation date
5/28/2009 9:50:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
4/15/2009
Doc Name
Requesting Assistance
From
Joe Dudash
To
Jim Stark
Type & Sequence
TR60
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V I S ION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />DATE: April 15, 2009 <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />TO: Jim Stark Executive Director <br />R Ronald W. Cattany <br />FROM: Joe Dudash Division Director <br />Natural Resource Trustee <br />RE: Bowie No. 21line, Permit No. C-1996-083, Bowie Resources LLC. <br />Technical Revision No. 60, Bond Reduction for Vent Shaft, Request for <br />Assistance <br />I am requesting your assistance in the review of the reclamation cost estimate for Technical <br />Revision No. 60 (TR-60) for the Bowie No. 2 Mine. In TR-60, Bowie Resources LLC is <br />requesting a bond reduction since one of two vent shafts at the Hubbard Creek vent shaft site was <br />not constructed. <br />As you know, this bond reduction request was originally submitted in MR-97 but it was <br />determined that a technical revision was needed for bond reduction requests. You already <br />calculated the cost for reclaiming the one vent shaft in MR-97 but it was tied in with the cost of <br />reclaiming the emergency escape hoist. For TR-60, the cost for reclaiming the shaft needs to be <br />separated out. <br />I will probably call TR-90 complete tomorrow so the decision due date will be Monday, April <br />27, 2009. I will be in the field most of next week but will be back on Friday April 24. If I could <br />have your cost estimate review memo by April 24, that would be great. <br />If you need any additional information, please let me know. <br />Thanks for your assistance! <br />cc: Sandy Brown <br />c:/word/bowie2/tr60memo 1 <br />Office of Office of <br />Minad Land Ralamatinn r)Pnvor • r.rand hinrtinn • I)rnrnnon 4r?ivo anrt In-6- Ui'-
The URL can be used to link to this page
Your browser does not support the video tag.