My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1977285 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2009-05-19_REVISION - M1977285 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:02 PM
Creation date
5/28/2009 7:48:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP (AM-03) Att. P: Drainage; Att. Q: SWMP Repair; Att. R: Rock & Soil Characterization (part 10)
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christy Woodward <br />July 31, 2008 <br />• Page 13 <br />M-1977-416, M-1978-039 HR, M-1977-285, M-1980-055 HR, M-1981-021 <br />and M-1977-032). March 31. <br />U.S. Department of Interior, Bureau of Land Management (BLM). 2004. Rick Management <br />Criteria for Metals at BLM Mining Sites. Technical Note 390 Rev. October. <br />Tables <br />Table 1 Summary of Data Collection Activities <br />Table 2 Development Rock, Ore, and Soil Sample Collection and Analysis Information <br />Figures <br />Figure 1 <br />Figure 2 <br />Figure 3 <br />Figure 4 <br />Figure 5 <br />Figure 6 <br />• Figure 7 <br />Figure 8 <br />Sunday Mines Group Location Map <br />Van 4 Mine Location Map <br />Diagrammatic Representation Of Development Rock Areas <br />St. Jude Mine Development Rock Sample Trench Locations <br />Sunday Mine Development Rock Sample Trench Locations <br />Topaz Mine Development Rock Sample Trench Locations <br />West Sunday Mine Development Rock Sample Trench Locations <br />Van 4 Mine Development Rock Sample Trench Locations <br />Attachments <br />Attachment A Standard Test Method for Column Percolation Extraction of Mine Rock <br />by the Meteoric Water Mobility Procedure <br />Attachment B Standard Test Method for 24-h Batch-Type Measurement of <br />Contaminant Sorption by Soils and Sediments <br />i <br />• 0.%4986 - Denison\Task Order 3 - DMO Sampling and Analysis flan\Task 3.1 - Soil Ore Rock Data Collection PlanWinal Denison Sunday Uses; Group Soil Ore Rods Data <br />Collection Work Plan.doc
The URL can be used to link to this page
Your browser does not support the video tag.