Laserfiche WebLink
Hydrogeological Evaluation of Sunday Mines Group <br />Introduction <br />is Exhibit 1-1. Permit and EPP Content Requirements for Groundwater Information and <br />T.,n 14- ofTvrfnrmnfinn in this Ranrn'f_ <br />C. <br />E <br />?i ili <br />LVI.IM1LLVIL V <br />Regulatory Citation <br />Information requested <br />Location of Information <br /> in Report <br />HRMMR §6.4.20(8) Locate on a map, in Exhibit Figures 1-1 and 2-1 <br />Groundwater Information C, all tributary water <br /> courses, wells, springs, <br /> stock water ponds, <br /> reservoirs and ditches, on <br /> the affected land and on <br /> adjacent lands where such <br /> structures or waters are <br /> within two (2) miles, of the <br /> existing or proposed <br /> affected lands. <br />HRMMR §6.4.20(8) Identify all known aquifers Section 2.4 <br />Groundwater Information and related subsurface <br /> water bearing fracture <br /> systems within two miles <br /> of the affected lands. <br />HRMMR §6.4.20(8) Describe all geologic Section 2.4 <br />Groundwater Information media down to and <br /> including the upper most <br /> aquifer under proposed <br /> sites of material storage, <br /> stockpiles, waste piles, <br /> disposal sites, solution <br /> containment facilities. <br />HRMMR §6.4.20(8) Identify and locate on a Section 2.4.2, Figures 2-1, <br />Groundwater Information map, known major 2-10,2-11,2-12,2-13 <br /> fracture systems that <br /> affect rock formations <br /> under proposed sites of <br /> material storage, <br /> stockpiles, waste piles, <br /> disposal sites, solution <br /> containment facilities and <br /> other sites within the <br /> existing or proposed <br /> affected area <br />1-4 <br />T:\64986-Denison Mines\Task Order 3 - DMO Sampling and Analysis Plan\Task 3.14 - Hydmgeology ReportViinal sunday hydro reporNext\PINAL Sunday Hydrogeology Report.doc