Laserfiche WebLink
Hydrogeological Evaluation of Sunday Mines Group <br />Introduction <br />Exhibit 1-1. 110d Permit and EPP Content Requirements for Groundwater Information and <br />• <br />?J <br />LVL."LLVLL v 1rL viK?.- ... --- - <br />Regulatory Citation -- - - <br />Information requested <br />Location of Information <br /> in Report <br />HRMMR §6.4.20(8) Describe and illustrate the Section 2.4 <br />Groundwater Information hydrogeology of the area <br /> where surface or <br /> groundwater may be <br /> impacted by the <br /> Designated Mining <br /> O eration activities. <br />HRMMR §6.4.20(9) Indicate the existing and Section 2.4.6 <br />Groundwater Quality Data reasonably potential future <br /> groundwater uses on and <br /> within two miles down- <br /> gradient of the affected <br /> lands. <br />HRMMR §6.4.20(9) Submit, at a minimum, Section 2.4.5.2 <br />Groundwater Quality Data groundwater quality data <br /> collected during five <br /> successive calendar <br /> quarters or as specified by <br /> the Division as may be <br /> necessary to adequately <br /> characterize baseline <br /> conditions. <br />HRMMR §6.4.20(7) Describe naturally Section 2.4.4, additional <br />Facilities Evaluation occurring geological and information is provided <br /> geochemical conditions, under separate cover in <br /> and alterations of these Geochemical Evaluation of <br /> conditions by the mining Development Rock and Ore, <br /> and metallurgical process. Sunday Group and Van 4 <br /> Mines, Uravan Mineral <br /> District, Colorado (CDM <br /> 2009 <br />HRMMR §6.4.20(13) Provide data for Section 2.3.1 <br />Climate Data precipitation, wind speed <br /> and direction, <br /> temperature, and <br /> evaporation <br />11?i 1 <br />1-5 <br />7:\84988-Denison Mines\Task Order 3 - DMO Sampling and Analysis Plan\Task 3.14 - Hydrogeology Reportlfnal Sunday hydro reporNextTINAL Sunday Hydrogeology Report.doc