Laserfiche WebLink
7) This facility is not required to have a facility response plan under Title 40 CFR Part <br />112.20 since it does not: <br />• Transfer oil over water from vessels and have a total oil storage capacity of <br />greater than or equal to 42,000 gallons, or <br />• Have a total storage capacity that exceeds 1 million gallons. <br />U <br />• <br />Denison Mines (USA) Corp. <br />Sunday Mines <br />28 <br />SPCC Plan <br />December 2007