My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1980055HR (33)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980055
>
2009-05-19_REVISION - M1980055HR (33)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:36 PM
Creation date
5/28/2009 7:36:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980055HR
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP (AM-01) Attachment L:Air Pollution; Att. M: SPCC; Att. N: GW Characterization (part 8)
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Any fuel in the drip pans, on the plastic tarp, or in the spill container on the fill pipe is <br />poured into the tank (if it has the capacity) or disposed of appropriately. <br />• The tank truck is inspected before the blocks are removed to ensure the lines have been <br />disconnected from the tank. <br />• The blocks are removed from truck wheels. <br />A copy of the fuel-unloading checklist is included in Appendix E, Table 9. <br />5.7 Brittle Fracture Evaluation [40 CFR II2.7(i)] <br />There are no field-constructed aboveground tanks at these facilities. <br />5.8 More Stringent State Requirements [40 CFR II2.7(j)J <br />The state of Colorado has established Oil Pollution Prevention - SPCC Plan requirements in 7 <br />CCR 1101-14, Article 3 Aboveground Storage Tanks. The requirements in this regulation are <br />not more stringent than the federal requirements of 40 CFR 112, except for the following: <br />Section 3-6-1 requires that SPCC Plans must be developed and implemented for facilities that <br />contain either: <br />• An aggregate aboveground oil storage capacity greater than 1,320 gallons; or <br />• Any single aboveground oil storage tank whose capacity exceeds 660 gallons. <br />Section 3-6-5(b) requires that owners/operators of facilities with an SPCC Plan complete a <br />review and evaluation of the Plan at least once every three years. <br /> <br />• <br /> <br /> <br />Denison Mines (USA) Corp. <br />Sunday Mines <br />25 <br />SPCC Plan <br />December 2007
The URL can be used to link to this page
Your browser does not support the video tag.