Laserfiche WebLink
<br /> <br />l? <br />CROSS-REFERENCE TABLE <br />This SPCC Plan has been prepared in accordance with 40 CFR Part 112 and is organized as <br />specified in the aforementioned regulation. The following cross-reference provides the location <br />of the requirements listed in 40 CFR Part 112 and the equivalent requirements in this Plan. <br />Information specific to the facility necessary to demonstrate conformance with the appropriate <br />SPCC requirements is included in Section 3.0. <br /> SPCC Rule <br />Citation <br />Description of Rule <br />Section <br />§ 112.7 General requirements for SPCC Plans for all facilities and all oil <br />t es. <br />3.0, 4.0, 5.0 <br /> General requirements <br /> Discussion of facility's conformance with rule requirements; <br /> Deviations from Plan requirements; <br />§ 112.7(a) Facility characteristics that must be described in the Plan <br />(including facility diagram); 3.0, 4.0, <br />Appendices <br /> Spill reporting information in the Plan; <br /> Emergency procedures. <br />§ 112.7(b) Fault analysis 3.0 <br />§ 112.7(c) Secondary containment 5.1 <br />§ 112.7(d) Contingency planning 5.2 <br />§ 112.7(e) Inspections, tests, and records 5.3 <br />§ 112.7(f) Employee training and discharge prevention procedures 5.4 <br />§ 112.7(g) Security (excluding oil production facilities) 5.5 <br />§ 112.7(h) Loading/unloading (excluding offshore facilities) 5.6 <br />§ 112.7(i) Brittle fracture evaluation requirements 5.7 <br />§ 112.70) Conformance with State requirements 5.8 <br />§ 112.8 Requirements for onshore facilities (excluding production <br />facilities <br />6.0 <br />§ 112.8(a) General and specific requirements 6.1 <br />§ 112.8(b) Facility drainage 6.2 <br />§ 112.8(c) Bulk storage containers 6.3 <br />§ 112.8(d) Facility transfer operations, pumping, and facility process 6.4 <br />Denison Mines (USA) Corp. <br />Sunday Mines <br />IV <br />SPCC Plan <br />December 2007