Laserfiche WebLink
• meet tailored facility security and tank integrity inspection requirements without PE <br />certification; and <br />• prepare a plan which includes PE-certified environmentally equivalent measures or <br />impracticability determinations that would require PE certification for only the portions <br />dealing with environmental equivalence and impracticability, determinations. The <br />remaining portions of the plan could be self-certified by the facility owner/operator. <br />It is recommended that all technical (non-administrative) changes and amendments to this SPCC <br />Plan be reviewed by a professional engineer. When needed, a new certification page will be <br />signed, sealed, and inserted into this plan to complete the amendment process. <br />• <br />( . .*' 0 <br />Denison Mines (USA) Corp. 3 SPCC Plan <br />Sunday Mines December 2007