My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1978039HR (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978039
>
2009-05-19_REVISION - M1978039HR (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:35 PM
Creation date
5/27/2009 2:39:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978039HR
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP (AM-01) SWMP Appendix D,E,F & G: Att. G,H,I: County; Att. J,K: BLM (part 7)
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Finally, the EA does not address the physical deterioration of the local roads and state <br />highways that will occur due to the proposed increase in heavy truck traffic. State <br />Highway 141 and State Highway 491 will receive the burden of transporting ore from the <br />study area. A significant portion of the highway segments are listed by CDOT as having <br />a Remaining Service Life (RSL) of 0-years. This means that the roads have deteriorated <br />to the point that only a major reconstruction of the roadway will fix the inherent problems <br />with the road surface. Currently, the State of Colorado has no money budgeted for road <br />improvements on these highways for at least the next 30 years. The EA does not address <br />the impacts that hauling up to 214,000 tons of ore per year will have on these roads, nor <br />does it discuss mitigation for these impacts. <br />CDOT appreciates the opportunity to comment on this EA and any future permits <br />impacts state highways, but is concerned that impacts to state highways and access <br />control issues have not been adequately disclosed or addressed. We request that the <br />BLM revise the EA to include impacts to the specific state highways affected by this <br />proposal and describe mitigation measure for safety, access, and road deterioration for the <br />proposed expansion. A Traffic Impact Study should be initiated, and the project <br />proponent needs to submit an application for a State of Colorado Access Permit. <br />Response: The Operator is required to comply with all state regulations, <br />including CDOT regulations. <br />• <br />The complete set of public comments and documentation of my evaluation and <br />consideration can be found in the project file at the San Juan Public Lands Center in <br />Durango, Colorado. <br />Decision Record 12 Sunday Mines Complex Expansion <br />Dolores Public Lands Office January 2009
The URL can be used to link to this page
Your browser does not support the video tag.