Laserfiche WebLink
• <br />Bonds <br />The following bonding schedule is intended to be a guide, and the Board of Cmity <br />Commissioners or Road Superinrendem may increase, decrease or elirrminnate the bond <br />repremmt after considering the scope of the project, location, time of year, contractor's <br />previous perforrnarm or other pertinent circumstances. <br />The type of bond will be specified when the permit is issued. . <br />1. Mtnor utility cut =$1000 or less, to be determined by Road Deparrfnerit personnel after <br />a pre-ronsrtiction inspection and consideration of the on-site conditions. . <br />2.. Utilities installation over 1000' = $1 per foot <br />3. Installation of overhead utilities =$250 per pole <br />4. Private rnaixenance of Coutzty Roads - Nf nirrnrm $1000 and-$1000 per mile. <br />5. Overweight or oversize vehicles - bond to be determined after-considering route, road <br />surface type, distance and mmber'of trips proposed. <br />• 6: All other activity or potential disturbance to County of application, Roads - to be detem*)ed-at the time <br />7. Mnizm= bond for hauling in excess of 3,000,000 pounds in a twelve rmrth period = <br />$'2000. Bond amouru above the minimum will be.deternnned after consider <br />In,,; ntirnber <br />of loads, total weight, road conditions, ler* of courrny road haul route and seasonal. <br />factors. . <br />Passed this 28th day of May 1996. <br /> <br />ATTEST : <br />aa.?v Q.s? a,?.? • <br />De ty. Clerk