Laserfiche WebLink
COR-030000 Stormwater Management Plan <br /> <br /> Table of Contents <br />- 1. INTRODUCTION .....................................................................................................1 <br />a) <br />................................... <br />The purpose of this SWMP is to: ........................................ <br />. <br />1 <br />b) Spill Prevention Control and Countermeasure (SPCC) Plan ................................. . 1 <br />2. SITE DESCRIPTION (§I.C.1) ................................................................................. 2 <br />a) Nature of the activity at the site (Permit Section (§) I.C. La): ............................... . 2 <br />b) The proposed sequence for major activities (§I.C.Lb): ......................................... . 2 <br />c) Disturbed area (§I.C.1.c) :....................................................................................... . 3 <br />d) Soils (§I.C.1.d) :...................................................................................................... . 3 <br />e) 1:xisting Vegetation (§I.C.1.e) :.............................................................................. . 4 <br />f) Location of Potential Pollution Sources (§I.C. Lf) :............................................... . 4 <br />g) Non-stormwater ((§I.C.l.g) and (§I.D.3)) :............................................................ . 4 <br />h) Receiving Waters (§I.C. Lh) :................................................................................. . 4 <br />i) Site Map (§I.C.2) :................................................................................................... 5 <br />3. Stormwater Management Controls ......................................................................... 6 <br />a) SWMP Administrator (§I.C.3.a) :............................................................................ 6 <br />b) Identification of Potential Pollutant Sources (§I.C.3.b) :......................................... 6 <br />c) BMPs for Stormwater Pollution Prevention (§I.C.3.c) :.......................................... 9 <br />4. Final Stabilization (§I.C.4.) .................................................................................... 22 <br />a) Description of Final Stabilization Practices (§I.C.4.a) and Methods (§I.C.4.b)... 22 <br />b) Final Stabilization Achievement (§I.C.4.c) ......................................................... 22 <br />5. Inspections I.C.S and I.D.6 .................................................................... 23 <br />a) Minimum Inspection Schedule (§I.D.6.a) ............................................................. 23 <br />b) Inspection Requirements (§I.D.6.b) ...................................................................... 24 <br />c) Required Actions Following Site Inspections (§I.D.6.c) ...................................... 25 <br />6. Maintenance (§I.D.7) and (§I.D.8) ......................................................................... 26 <br />a) BMP Maintenance (§LD.7) ................................................................................... 26 <br />b) Replacement and Failed BMPs (§I.D.8) ............................................................... 26 <br />7. SWMP Requirements (§I.D.5) ............................................................................... 27 <br />a) SWMP Implementation (§I.D.5.a) :....................................................................... 27 <br />b) SWMP Retention (§I.D.5.b) :................................................................................ 27 <br />c) SWMP Revisions (§I.D.5.c) :................................................................................ 27 <br />d) Responsive SWMP Changes (§I.D.5.d) :............................................................... 27 <br />e) SWMP Availability (§I.D.10) ............................................................................... 28 <br />8. Noncompliance Notification (§II.A.3) :.................................................................. 29 <br />a) What to report ....................................................................................................... 29 <br />b) Verbal Notification ............................................................................................... 29 <br />9. REFERENCES ........................................................................................................ 30 <br />(. : . 7!-:: (0